Find Interview Questions for Top Companies
Thundersoft Interview Questions and Answers
Ques:- Absolutely! Here’s a clean and concise list of ABAP (Advanced Business Application Programming) interview or learning questions, formatted in your preferred style:
Right Answer:
1. What is ABAP?
2. Explain the difference between a transparent table and a pooled table.
3. What are data dictionary objects in ABAP?
4. How do you create a report in ABAP?
5. What is a BAPI?
6. Explain the use of internal tables in ABAP.
7. What is the purpose of the SELECT statement in ABAP?
8. How do you handle exceptions in ABAP?
9. What is a function module?
10. Describe the difference between a function module and a method in ABAP.
Ques:- What are the differences between ARM and Thumb instruction sets
Right Answer:
The ARM instruction set is a 32-bit architecture that provides a wide range of instructions and addressing modes, while the Thumb instruction set is a 16-bit compressed version of the ARM instruction set that uses fewer bits per instruction, allowing for more efficient use of memory. Thumb instructions are generally smaller and can improve performance in memory-constrained environments, but they have a more limited set of instructions compared to ARM.
Ques:- What is the role of a software developer and how does it differ from other roles like a software engineer or architect
Right Answer:
A software developer primarily focuses on writing, testing, and maintaining code to create software applications. They are involved in the implementation of features and fixing bugs. In contrast, a software engineer applies engineering principles to software development, often involving system design and architecture. A software architect, on the other hand, is responsible for the overall structure and high-level design of software systems, making decisions about technology and frameworks used.
Ques:- What’s the difference between editable templates and static templates in AEM
Right Answer:
Editable templates in AEM allow authors to customize the layout and content of a page using a flexible, drag-and-drop interface, enabling dynamic content and reusable components. Static templates, on the other hand, are fixed layouts defined by developers, where the structure and components are set at design time, limiting authoring flexibility.
Ques:- How do you handle configuration of diagnostic (DEM, DCM) modules during integration
Right Answer:
To handle the configuration of diagnostic modules (DEM, DCM) during integration, I follow these steps:

1. **Define Diagnostic Requirements**: Gather and document the diagnostic requirements based on the system specifications and use cases.

2. **Configure DEM**: Set up the Diagnostic Event Manager (DEM) by defining diagnostic events, their statuses, and conditions for reporting. This includes configuring the event storage and handling mechanisms.

3. **Configure DCM**: Set up the Diagnostic Communication Manager (DCM) by defining services, protocols, and communication parameters. Ensure that the DCM is aligned with the diagnostic services required by the application.

4. **Use AUTOSAR Tools**: Utilize AUTOSAR-compliant tools for configuration, ensuring that the settings are consistent with the AUTOSAR specifications.

5. **Integration Testing**: Conduct integration testing to verify that the DEM and DCM modules interact correctly and that diagnostic information is accurately reported and handled.

6. **Iterate and Optimize**:
Ques:- In the source, if we also have duplicate records and we have 2 targets, T1- for unique values and T2- only for duplicate values. How do we pass the unique values to T1 and duplicate values to T2 from the source to these 2 different targets in a single mapping?
Asked In :- thundersoft,
Ques:- Interviewer asked me to implement power function, I suggested a recursive implementation where we multiply x^y/2 and x^y/2 for calculating x^y. But asked me for an efficient iterative algorithm.
Asked In :- thundersoft,
Ques:- Can you describe what a sprint backlog is and how it is created
Right Answer:
A sprint backlog is a detailed plan of work for a specific sprint, derived from the product backlog. It's created during sprint planning by the development team, who select items from the product backlog they commit to complete, then break down those items into tasks and estimate the effort required for each.
Ques:- How do you ensure that Agile teams maintain focus and productivity during iterations
Right Answer:
* **Clear Sprint Goals:** Define specific, measurable, achievable, relevant, and time-bound (SMART) goals for each iteration.
* **Daily Stand-ups:** Facilitate short, focused daily meetings to identify roadblocks and coordinate efforts.
* **Sprint Backlog Management:** Keep the sprint backlog refined, prioritized, and realistic based on team capacity.
* **Timeboxing:** Adhere to time limits for meetings and tasks to prevent scope creep and maintain momentum.
* **Focus on Value:** Prioritize tasks that deliver the most business value within the iteration.
* **Remove Impediments:** Proactively identify and resolve obstacles that hinder the team's progress.
* **Limit Work in Progress (WIP):** Encourage the team to focus on completing tasks before starting new ones.
* **Continuous Feedback:** Regularly review progress, gather feedback, and adapt plans as needed.
* **Defined "Definition of Done":** Ensure a clear understanding of what it means for a task to be considered complete.
* **Team Collaboration & Communication:** Foster open and effective communication and collaboration within the team.
Ques:- How do you handle scope creep or changes during a sprint
Right Answer:
During a sprint, I generally avoid scope creep. If a change request is small and doesn't impact the sprint goal, the team can discuss and decide if it can be included. If the change is significant, it goes into the product backlog to be prioritized for a future sprint.
Ques:- How do you facilitate and ensure effective sprint retrospectives
Right Answer:
To facilitate effective sprint retrospectives, I would:

1. **Set the Stage:** Create a safe and open environment where the team feels comfortable sharing.
2. **Gather Data:** Collect information about what went well, what didn't, and any challenges faced during the sprint.
3. **Generate Insights:** Facilitate a discussion to identify root causes and patterns.
4. **Decide on Actions:** Collaborate to define specific, actionable, measurable, achievable, relevant, and time-bound (SMART) improvements.
5. **Close the Retrospective:** Summarize action items and assign owners.
6. **Follow Up:** Track progress on action items in subsequent sprints to ensure continuous improvement.
Ques:- What are Agile ceremonies (like sprint planning, daily stand-ups, sprint reviews, retrospectives), and how do they work
Right Answer:
Agile ceremonies are recurring meetings within a sprint to facilitate communication, planning, and continuous improvement.

* **Sprint Planning:** The team decides what work to complete in the upcoming sprint. They discuss user stories, estimate effort, and define the sprint goal.

* **Daily Stand-up:** A brief daily meeting where the team shares progress, identifies roadblocks, and coordinates efforts. Each member typically answers: What did I do yesterday? What will I do today? Are there any impediments?

* **Sprint Review:** The team demonstrates the completed work to stakeholders, gathering feedback and ensuring alignment with expectations.

* **Sprint Retrospective:** The team reflects on the past sprint, identifying what went well, what could be improved, and defining action items to enhance future performance.
Ques:- State the difference between Enteric coated and normal coated?
Right Answer:
Enteric-coated tablets are designed to dissolve in the intestine rather than the stomach, protecting the drug from stomach acid and preventing stomach irritation. Normal-coated tablets dissolve in the stomach.
Ques:- The firm has assigned you to consult a company intending to drop a product or expand into new markets in order to increase revenue. What steps would you take to help this company achieve its objective?
Right Answer:
1. Analyze current product performance: Review sales data, profit margins, and customer feedback.
2. Identify market trends: Research industry trends and competitor performance.
3. Evaluate customer needs: Conduct surveys or focus groups to understand customer preferences.
4. Assess financial impact: Calculate the costs and benefits of dropping the product versus expanding.
5. Explore new markets: Identify potential new markets and assess their viability.
6. Develop a strategy: Create a detailed plan for either discontinuing the product or entering new markets.
7. Implement the plan: Execute the chosen strategy with clear timelines and responsibilities.
8. Monitor results: Track performance metrics and adjust the strategy as needed.
Ques:- What would you do if you were the one survivor in an earthquake?
Right Answer:
I would assess my surroundings for safety, check for injuries, find a safe location, signal for help, and gather supplies if possible.
Ques:- A major US beer company, Beer Brew, recently entered the UK market. Two years after entry, the company is still losing money. Despite a high per capita consumption of beer in the UK market, sales have been very disappointing. What explains this phenomenon?
Right Answer:
Beer Brew may be facing issues such as strong local competition, lack of brand recognition, misalignment with consumer preferences, ineffective marketing strategies, or distribution challenges in the UK market.
AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users