Find Interview Questions for Top Companies
Sparx Interview Questions and Answers
Ques:- What are the differences between Agile, Waterfall, and DevOps methodologies
Right Answer:
Agile is an iterative approach that focuses on collaboration and flexibility, allowing for changes throughout the development process. Waterfall is a linear and sequential model where each phase must be completed before moving to the next, making it less adaptable to changes. DevOps is a culture and set of practices that combines software development (Dev) and IT operations (Ops) to improve collaboration, automate processes, and shorten the development lifecycle, emphasizing continuous integration and delivery.
Ques:- What is an RPort and PPort in AUTOSAR
Right Answer:
In AUTOSAR, an RPort (Receiver Port) is used for receiving data from other components, while a PPort (Provider Port) is used for providing data to other components.
Ques:- What is the role of CMSIS in ARM development
Right Answer:
CMSIS (Cortex Microcontroller Software Interface Standard) provides a standardized software framework for ARM Cortex-M microcontrollers, facilitating easier development by offering a set of APIs, device drivers, and middleware that streamline the programming process and enhance code portability across different ARM devices.
Ques:- What experience do you have with AEM Sites, Assets, or Forms
Right Answer:
I have experience working with AEM Sites by developing and managing web pages using templates and components. I have also worked with AEM Assets for organizing and optimizing digital assets, including images and videos, and I have experience with AEM Forms for creating and managing forms and workflows.
Ques:- What’s the difference between editable templates and static templates in AEM
Right Answer:
Editable templates in AEM allow authors to customize the layout and content of a page using a flexible, drag-and-drop interface, enabling dynamic content and reusable components. Static templates, on the other hand, are fixed layouts defined by developers, where the structure and components are set at design time, limiting authoring flexibility.
Ques:- What is the memory allocated by the following definition ? int (*x)[10];
Asked In :- Sparx,
Comments
Admin May 17, 2020

It will occupy 2 bytes of memory(In 16-bit system).
Explanation: int (*x)[10] means pointer to an array of 10
integers , not an array of 10 nos. of integer pointers. So
any pointer can take two bytes of memory.

Admin May 17, 2020

integer occupies 4 bytes in *nix os and 2 byte in DOS/Windows ,so the right answer is sizeof(int)*10.

Ques:- Explain the Polymorphism principle.
Comments
Admin Jan 29, 2020

The meaning of Polymorphism is something like one name many forms. Polymorphism enables one entity to be used as as general category for different types of actions. The specific action is determined by the exact nature of the situation. The concept of polymorphism can be explained as "one interface, multiple methods".

Ques:- How do you determine realistic schedules for the project?
Right Answer:
To determine realistic schedules for a project, I follow these steps:

1. Define project scope and deliverables.
2. Break down tasks into smaller, manageable components (Work Breakdown Structure).
3. Estimate the time required for each task using historical data and expert input.
4. Identify dependencies between tasks to understand the sequence of work.
5. Consider resource availability and constraints.
6. Use project management tools to create a timeline and visualize the schedule.
7. Review and adjust the schedule based on team feedback and potential risks.
8. Monitor progress regularly and be flexible to make adjustments as needed.
Ques:- What are the Risk Factors during Project Implementation?
Right Answer:
Risk factors during project implementation include:

1. Scope Creep: Uncontrolled changes or continuous growth in project scope.
2. Resource Availability: Lack of necessary resources, including personnel and materials.
3. Budget Overruns: Exceeding the allocated budget due to unforeseen expenses.
4. Time Constraints: Delays in project timelines affecting delivery.
5. Stakeholder Engagement: Lack of support or communication from stakeholders.
6. Technology Issues: Problems with tools or systems used in the project.
7. Regulatory Compliance: Failing to meet legal or industry standards.
8. Team Dynamics: Conflicts or lack of collaboration among team members.
9. Market Changes: Shifts in market conditions affecting project relevance.
10. Risk Management: Inadequate identification and mitigation of potential risks.
Ques:- PLANNING AND BUDGETING
Right Answer:
Effective planning and budgeting in construction involves defining project scope, estimating costs, allocating resources, creating a timeline, and regularly monitoring progress against the budget to ensure financial control and project success.
Ques:- ROLE & RESPONSIBILITY AT SAUDI KAYAN PROJECT.
Right Answer:
As a project manager at the Saudi Kayan project, my role and responsibilities included overseeing project planning, coordinating with stakeholders, managing resources, ensuring compliance with safety and quality standards, monitoring project progress, and delivering the project on time and within budget.
Ques:- How do you measure success in an Agile project, both in terms of output and team health
Right Answer:
Success in Agile is measured by:

* **Output:** Delivering valuable, working software frequently; achieving the product vision; meeting business goals; customer satisfaction; and predictability (consistent delivery).
* **Team Health:** Team morale; continuous improvement (velocity trends, retrospectives leading to action); collaboration; self-organization; and sustainable pace.
Ques:- What is the importance of cross-functional teams in Agile, and how do you foster collaboration
Right Answer:
Cross-functional teams in Agile are important because they bring together all the necessary skills to complete work without dependencies on other teams. This leads to faster delivery, better problem-solving, and increased innovation. To foster collaboration, encourage open communication, shared understanding of goals, mutual respect, and a focus on collective ownership.
Ques:- What is the difference between Kanban and Scrum, and when would you use each
Right Answer:
Kanban focuses on visualizing workflow, limiting work in progress (WIP), and continuous flow. Scrum uses time-boxed iterations (sprints) with specific roles (Scrum Master, Product Owner, Development Team) and events (sprint planning, daily scrum, sprint review, sprint retrospective).

Use Kanban when you need continuous delivery, have evolving priorities, and want to improve workflow incrementally. Use Scrum when you need structured development with fixed-length iterations, have clear goals for each iteration, and benefit from team collaboration with defined roles.
Ques:- How do you ensure that Agile processes are being followed consistently
Right Answer:
We ensure consistent Agile processes through:

* **Training and coaching:** Ensuring the team understands Agile principles and practices.
* **Regular audits and retrospectives:** Identifying deviations and areas for improvement.
* **Using tools and templates:** Standardizing processes and providing guidelines.
* **Defining clear roles and responsibilities:** Ensuring everyone knows their part in the process.
* **Promoting open communication and feedback:** Encouraging early detection of issues.
Ques:- How do you approach Agile at scale (e.g., SAFe, LeSS) for larger teams or organizations
Right Answer:
I would assess the organization's context, choose a suitable scaling framework like SAFe or LeSS based on needs, implement it incrementally with training and coaching, focusing on value delivery, and continuously inspect and adapt the implementation based on feedback and results.
AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users