Find Interview Questions for Top Companies
Smith + andersen Interview Questions and Answers
Ques:- What are stereo vision and structure from motion (SfM)? How do they differ?
Right Answer:
Stereo vision is a technique that uses two or more cameras to capture images from different viewpoints to perceive depth and create a 3D representation of a scene. Structure from Motion (SfM) is a process that reconstructs 3D structures from a series of 2D images taken from different angles, estimating camera positions and scene geometry simultaneously. The main difference is that stereo vision relies on simultaneous images from multiple cameras, while SfM uses sequential images from a single camera or multiple cameras over time.
Ques:- What are common algorithms used for stereo matching?
Right Answer:
Common algorithms used for stereo matching include:

1. Block Matching
2. Semi-Global Matching (SGM)
3. Dynamic Programming
4. Graph Cuts
5. Belief Propagation
6. Deep Learning-based methods (e.g., Convolutional Neural Networks)
Ques:- Explain the concept of depth perception in 3D vision. How is it achieved computationally?
Right Answer:
Depth perception in 3D vision refers to the ability to perceive the distance of objects in a three-dimensional space. It is achieved computationally through various techniques, including:

1. **Binocular Disparity**: Using two slightly different images from each eye to calculate depth based on the difference in their positions.
2. **Monocular Cues**: Utilizing single-eye cues like size, texture gradient, overlap, and perspective to infer depth.
3. **Motion Parallax**: Observing how objects move relative to each other as the observer moves, providing depth information based on their relative motion.
4. **Depth Sensors**: Using devices like LiDAR or stereo cameras to measure distances directly.

These methods help create a perception of depth in 3D environments.
Ques:- What is bundle adjustment? When is it used in 3D reconstruction?
Right Answer:
Bundle adjustment is an optimization technique used in 3D reconstruction to refine the 3D coordinates of points and the camera parameters simultaneously. It minimizes the re-projection error between observed image points and projected 3D points, ensuring a more accurate and consistent 3D model. It is typically used after initial structure-from-motion processes to improve the quality of the reconstruction.
Ques:- What is 3D vision and how is it different from 2D computer vision?
Right Answer:
3D vision refers to the ability of a system to perceive depth and spatial relationships in a three-dimensional space, allowing it to understand the shape, size, and position of objects. In contrast, 2D computer vision processes images as flat, two-dimensional representations, lacking depth information.
Ques:- What is systems for quality measures
Right Answer:
Systems for quality measures refer to structured frameworks or methodologies used to assess, monitor, and improve the quality of products or services. These systems typically include standards, metrics, and processes that help organizations ensure they meet customer expectations and regulatory requirements. Examples include Total Quality Management (TQM), Six Sigma, and ISO standards.
Ques:- Design engineer
Right Answer:
To design a product, start by defining the requirements, create conceptual sketches, develop detailed designs using CAD software, prototype the design, test for functionality and safety, and iterate based on feedback until the final product meets all specifications.
Ques:- What is swagging and fullering?
Right Answer:
Swagging is a metal forming process that involves deforming a workpiece by applying pressure to create a desired shape, often using a die. Fullering is a specific type of forging operation that involves reducing the cross-section of a metal piece by applying pressure with a tool called a fuller, which creates a groove or indentation.
Ques:- How many types of bearing are there?
Right Answer:
There are several types of bearings, including:

1. Ball Bearings
2. Roller Bearings
3. Needle Bearings
4. Thrust Bearings
5. Magnetic Bearings
6. Fluid Bearings
7. Sleeve Bearings (or Plain Bearings)
Ques:- Final year project detail
Right Answer:
My final year project focused on developing a smart irrigation system using IoT technology. The system automatically monitors soil moisture levels and adjusts water supply accordingly, optimizing water usage for agriculture. It included sensors, a microcontroller, and a mobile app for real-time monitoring and control.
Ques:- How to do five year planning and automatic forecast?
Right Answer:
To do five-year planning and automatic forecasting, follow these steps:

1. **Define Objectives**: Establish clear long-term goals and objectives for the organization.
2. **Data Collection**: Gather historical data and market research relevant to your industry.
3. **Trend Analysis**: Analyze historical data to identify trends and patterns that can influence future performance.
4. **Scenario Planning**: Develop different scenarios based on potential market changes, economic conditions, and internal factors.
5. **Forecasting Models**: Use statistical methods and forecasting models (like time series analysis or regression) to project future outcomes based on the collected data.
6. **Review and Adjust**: Regularly review forecasts against actual performance and adjust plans as necessary.
7. **Automation Tools**: Utilize software tools for data analysis and forecasting to automate the process and improve accuracy.

By following these steps, you can create a structured five-year plan with automated forecasting capabilities.
Ques:- Is it possible to put all the reinforcing steel at the top of the beam? if yes how? if no, why?
Right Answer:
No, it is not advisable to put all the reinforcing steel at the top of the beam because beams primarily experience bending moments that cause tension at the bottom and compression at the top. Placing all the steel at the top would not effectively resist the tensile forces, leading to structural failure.
Ques:- What are the five control components of a project?
Right Answer:
The five control components of a project are:

1. Scope Control
2. Schedule Control
3. Cost Control
4. Quality Control
5. Risk Control
Ques:- What is the difference between development length & overlap length ?
Right Answer:
Development length is the length of rebar required to be embedded in concrete to develop its full strength, while overlap length is the length of rebar that is overlapped and tied together to ensure continuity in reinforcement when two bars are joined.
Ques:- What is the difference between QA and testing?
Right Answer:
QA (Quality Assurance) is a process-oriented practice that focuses on ensuring quality in the development process and preventing defects, while testing is a product-oriented activity that involves executing the software to identify defects.
AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users