Ques:- While running a script on QTP 8.2 i got this run time error “General run error”. What may be the cause for this error? and How to resolve this error?
Right Answer: A mechanical design engineer is a professional who uses engineering principles to design, develop, and analyze mechanical systems and components, ensuring they meet specified requirements and function effectively.
Right Answer: The role of a Planning Manager involves overseeing project planning and scheduling, coordinating resources, managing timelines, and ensuring that projects are completed on time and within budget. They analyze project requirements, develop plans, and communicate with stakeholders to align objectives.
Right Answer: Ericsson BTS (Base Transceiver Station) in full configuration refers to a complete setup of the equipment used in mobile networks to facilitate wireless communication between the mobile devices and the network. It includes components like antennas, transceivers, controllers, and power supply systems, all configured to support various radio technologies and ensure optimal performance in handling calls and data traffic.
Right Answer: I addressed low team morale by organizing a team meeting to openly discuss concerns and gather feedback. For example, during a project where deadlines were missed, I acknowledged the team's hard work but also highlighted areas for improvement. I provided constructive feedback in a one-on-one performance review, focusing on specific behaviors and setting clear goals for future performance, while also recognizing their strengths to maintain motivation.
Right Answer: Yes, GMP (Good Manufacturing Practices) is necessary even if there is a quality control laboratory, as it ensures that products are consistently produced and controlled according to quality standards throughout the manufacturing process.
Right Answer: Yes, Good Manufacturing Practices (GMP) help boost pharmaceutical export opportunities by ensuring product quality, safety, and compliance with international regulations, which builds trust with foreign markets.
Right Answer: During my industrial training program, I gained hands-on experience in process engineering by working on real-world projects. I learned about process optimization, quality control, and the use of various engineering tools and software. I also collaborated with cross-functional teams, which enhanced my understanding of industry practices and improved my problem-solving skills.
Right Answer: To calculate the shuttering material, follow these steps:
1. **Determine the dimensions** of the area to be shuttered (length, width, height).
2. **Calculate the total surface area** to be covered by the shuttering:
- For walls: Area = Height × Length (for each wall)
- For slabs: Area = Length × Width
3. **Add the areas** of all surfaces to get the total surface area.
4. **Account for the type of material** used (plywood, metal, etc.) and its thickness.
5. **Calculate the quantity** of shuttering material required based on the total surface area and the dimensions of the individual shuttering panels.
Make sure to include a waste factor (typically 10-15%) to account for cuts and defects.
Right Answer: A RMC (Ready Mixed Concrete) Batching Slip is a document that provides details about the concrete mix being delivered. It typically includes information such as the batch number, date and time of batching, type of concrete mix, quantities of materials used (cement, aggregates, water, additives), the total volume of concrete, and the delivery location. This slip ensures that the correct mix is produced and delivered according to specifications.
Right Answer: To prepare a concrete cube, follow these steps:
1. **Materials**: Gather cement, sand, gravel (or crushed stone), and water.
2. **Mixing**: Use a concrete mixer or a mixing tray to combine the materials in the ratio of 1 part cement, 2 parts sand, and 3 parts gravel. Add water gradually until the mixture is workable but not too wet.
3. **Molding**: Pour the mixed concrete into a cube mold (typically 150mm x 150mm x 150mm) and ensure it fills all corners.
4. **Compacting**: Use a tamper or a vibrating table to compact the concrete and remove air bubbles.
5. **Curing**: Cover the mold with a plastic sheet or wet burlap to retain moisture and allow it to cure for at least 24 hours.
6. **Demolding**: After 24 hours, remove the cube from the mold and place it in a curing environment