Find Interview Questions for Top Companies
Appway Interview Questions and Answers
Ques:- How do you implement custom workflows in AEM
Right Answer:
To implement custom workflows in AEM, follow these steps:

1. **Create a Workflow Model**: Use the AEM Workflow Model Editor to design your workflow. Define the steps and the order in which they will execute.

2. **Add Workflow Steps**: Include custom workflow processes by creating Java classes that extend `WorkflowProcess`. Implement the `execute` method to define the logic for each step.

3. **Register the Workflow Process**: Use the OSGi configuration to register your custom workflow process in AEM.

4. **Create a Workflow Launchers**: Set up workflow launchers to trigger the workflow based on specific events or conditions, such as content creation or modification.

5. **Test the Workflow**: Deploy your workflow and test it to ensure it functions as expected.

6. **Monitor and Debug**: Use the AEM Workflow console to monitor the execution and debug any issues that arise.
Ques:- How do you implement error handling and recovery in Ab Initio
Right Answer:
In Ab Initio, error handling and recovery can be implemented using the following methods:

1. **Error Handling Components**: Use components like `Error Handling` and `Error Outputs` to capture and manage errors during data processing.
2. **Checkpoints**: Implement checkpoints in graphs to save the state of processing, allowing recovery from specific points in case of failures.
3. **Log Files**: Utilize log files to record error messages and details for troubleshooting.
4. **Conditional Logic**: Use conditional components to redirect data flow based on error conditions, allowing for alternative processing paths.
5. **Data Quality Checks**: Incorporate data validation checks to catch errors early in the process before they propagate further.
Ques:- How does RTE handle client-server communication
Right Answer:
The RTE (Runtime Environment) handles client-server communication by using a defined interface that allows client applications to request services from server applications. It manages the communication through the use of ports, where the client sends requests via a request port and the server responds through a response port. The RTE ensures that the data is correctly marshaled and unmarshaled between the client and server, facilitating seamless interaction while adhering to the AUTOSAR standards.
Ques:- What is the role of an AUTOSAR Stack Integration Lead
Right Answer:
The role of an AUTOSAR Stack Integration Lead is to oversee the integration of the AUTOSAR software stack into vehicle systems, ensuring that all components work together seamlessly. This includes coordinating between different teams, managing the integration process, resolving technical issues, and ensuring compliance with AUTOSAR standards.
Ques:- How do you handle configuration of diagnostic (DEM, DCM) modules during integration
Right Answer:
To handle the configuration of diagnostic modules (DEM, DCM) during integration, I follow these steps:

1. **Define Diagnostic Requirements**: Gather and document the diagnostic requirements based on the system specifications and use cases.

2. **Configure DEM**: Set up the Diagnostic Event Manager (DEM) by defining diagnostic events, their statuses, and conditions for reporting. This includes configuring the event storage and handling mechanisms.

3. **Configure DCM**: Set up the Diagnostic Communication Manager (DCM) by defining services, protocols, and communication parameters. Ensure that the DCM is aligned with the diagnostic services required by the application.

4. **Use AUTOSAR Tools**: Utilize AUTOSAR-compliant tools for configuration, ensuring that the settings are consistent with the AUTOSAR specifications.

5. **Integration Testing**: Conduct integration testing to verify that the DEM and DCM modules interact correctly and that diagnostic information is accurately reported and handled.

6. **Iterate and Optimize**:
Ques:- Can you describe what a sprint backlog is and how it is created
Right Answer:
A sprint backlog is a detailed plan of work for a specific sprint, derived from the product backlog. It's created during sprint planning by the development team, who select items from the product backlog they commit to complete, then break down those items into tasks and estimate the effort required for each.
Ques:- What is the role of a Scrum Master, and how do you facilitate a Scrum team
Right Answer:
The Scrum Master is a servant-leader who helps the Scrum Team follow the Scrum framework. They facilitate Scrum events (Sprint Planning, Daily Scrum, Sprint Review, Sprint Retrospective), remove impediments, protect the team from distractions, and coach the team on Agile principles and practices.
Ques:- How do you facilitate and ensure effective sprint retrospectives
Right Answer:
To facilitate effective sprint retrospectives, I would:

1. **Set the Stage:** Create a safe and open environment where the team feels comfortable sharing.
2. **Gather Data:** Collect information about what went well, what didn't, and any challenges faced during the sprint.
3. **Generate Insights:** Facilitate a discussion to identify root causes and patterns.
4. **Decide on Actions:** Collaborate to define specific, actionable, measurable, achievable, relevant, and time-bound (SMART) improvements.
5. **Close the Retrospective:** Summarize action items and assign owners.
6. **Follow Up:** Track progress on action items in subsequent sprints to ensure continuous improvement.
Ques:- Can you describe a time when an Agile project didn’t go as planned and how you handled it
Right Answer:
"In one project, we underestimated the complexity of integrating a new third-party API. This caused us to miss our sprint goal. To address this, we immediately re-estimated the remaining work, broke down the integration into smaller, more manageable tasks, and increased communication with the API vendor. We also temporarily shifted team focus to prioritize the integration, delaying a lower-priority feature for the next sprint. Finally, in the sprint retrospective, we implemented a better vetting process for third-party integrations to avoid similar issues in the future."
Ques:- What is Agile methodology, and how does it differ from traditional project management approaches
Right Answer:
Agile is an iterative and incremental approach to project management that focuses on collaboration, flexibility, and customer satisfaction. Unlike traditional, sequential (waterfall) methods, Agile embraces change throughout the project lifecycle through short development cycles called sprints.
Ques:- What are beams, panels, experience etc?
Right Answer:
Beams are structural elements that support loads and span between supports, typically used in buildings and bridges. Panels refer to flat sections of materials, often used in walls or ceilings, that can provide structural support or aesthetic finishes. Experience in this context usually refers to practical knowledge and skills gained through working on projects involving beams and panels.
Ques:- Have you ever dealt with a situation where communications were poor? Where there was a lack of cooperation? Lack of trust? How did you handle these situations?
Right Answer:
Yes, I have encountered situations with poor communication and lack of cooperation. In such cases, I focused on facilitating open dialogue by organizing a meeting where everyone could express their concerns and ideas. I encouraged active listening and ensured that all voices were heard. To build trust, I emphasized transparency and followed up on commitments. This approach helped improve collaboration and foster a more positive working environment.
Ques:- Suppose you are working for a leading manufacturer of electronic equipment for industrial customers. The R&D department has developed a new product — a device that could replace all energy costs (electric, gas, etc.) using solar technology. The estimated price to the customer would be 15 lakh per house, with a payback period of 3 to 5 years. The R&D department says the estimated investment is 600 crore. What is your opinion?
Right Answer:

The investment of 600 crore seems high compared to the potential revenue from selling the product at 15 lakh per house. To assess viability, we need to calculate the break-even point and consider market demand, competition, and potential barriers to adoption. If the market is large enough and the product is competitive, it could be a worthwhile investment; otherwise, it may pose significant financial risks.

Ques:- Your company installed an ERP system 3 years ago, spending a cumulative $100M to do so. The CEO asks you, was this a financially sound investment?
Right Answer:
To determine if the ERP system was a financially sound investment, we need to analyze the return on investment (ROI). We should compare the cumulative benefits gained from the ERP system over the past 3 years against the $100M spent. If the benefits exceed $100M, it was a sound investment; if not, it was not financially sound.
Ques:- Estimate costs of building a metro?
Right Answer:
Estimating the costs of building a metro involves several factors, including land acquisition, construction materials, labor, equipment, and operational expenses. A rough estimate can range from $100 million to over $1 billion per mile, depending on the location, complexity, and design of the metro system.
Ques:- How do you manage suppliers?
Right Answer:
I manage suppliers by establishing clear communication, setting expectations, monitoring performance, building strong relationships, and regularly reviewing contracts and agreements to ensure alignment with project goals.
Ques:- Explain how best you can deliver the inputs for such kind of project.
Right Answer:
To deliver the inputs for a construction project effectively, I would:

1. **Conduct Thorough Planning**: Define project scope, objectives, and deliverables clearly.
2. **Engage Stakeholders**: Collaborate with all stakeholders to gather requirements and expectations.
3. **Develop a Detailed Schedule**: Create a timeline with milestones for each phase of the project.
4. **Allocate Resources**: Identify and assign the necessary resources, including labor, materials, and equipment.
5. **Establish Communication Channels**: Set up regular meetings and updates to ensure everyone is informed and aligned.
6. **Implement Risk Management**: Identify potential risks early and develop mitigation strategies.
7. **Monitor Progress**: Use project management tools to track progress and make adjustments as needed.
8. **Ensure Compliance**: Adhere to safety regulations, building codes, and quality standards throughout the project.
Ques:- What is your role in current industry?
Right Answer:
As a Project Manager in the construction industry, my role involves planning, executing, and overseeing projects to ensure they are completed on time, within budget, and to the required quality standards. I coordinate with various stakeholders, manage resources, and address any issues that arise during the project lifecycle.
Ques:- How to reduce power consumption
Right Answer:
To reduce power consumption, you can implement the following strategies:

1. Use energy-efficient appliances and equipment.
2. Optimize production processes to minimize energy use.
3. Implement regular maintenance to ensure equipment operates efficiently.
4. Utilize renewable energy sources where possible.
5. Educate employees on energy-saving practices.
6. Monitor and analyze energy usage to identify areas for improvement.
7. Install energy management systems to track and control consumption.
AmbitionBox Logo

What makes Takluu valuable for interview preparation?

1 Lakh+
Companies
6 Lakh+
Interview Questions
50K+
Job Profiles
20K+
Users